Skip to content

Fit-out Time-lapse Video Production in Dubai

An empty shell becoming a finished office, shop or restaurant. We place a camera inside the space for the length of the fit-out and edit the result into a short film for your portfolio and launch.

  • Weeks into a minuteShell to opening day
  • Before and afterPortfolio and social cuts

Fit-out time-lapse enquiry

Request a Quote

We reply within one working day.

We use your details only to reply to this enquiry. Privacy Policy

Who buys it

Who uses fit-out time-lapse.

A fit-out changes a room completely in a few weeks, which makes it one of the most watchable kinds of time-lapse.

  • i.

    Fit-out contractors

    Show clients how a space came together, on schedule, for tenders and the company profile.

  • ii.

    Interior designers

    Let people watch the design take shape, not only the finished photos.

  • iii.

    Brands opening a store or restaurant

    A countdown clip for social media before the doors open.

  • iv.

    Companies moving office

    An internal film for staff, showing the new workplace being built.

How it works

Inside the space, for the length of the job.

StageWhat happens
Before work startsWe pick one or two corners that show the whole space and will not be boxed in by partitions or ceilings.
InstallationThe camera goes high on a wall or column, on mains power where available and battery otherwise.
CaptureFrames through working hours, usually for four to sixteen weeks, depending on the size of the fit-out.
ChecksWe visit when needed to clean the lens and make sure no scaffold or partition has blocked the view.
EditA 45 to 90 second film, a short social cut and before-and-after stills.

Interior challenges

Why indoor time-lapse needs more planning.

Inside, the lighting changes as the job progresses. Work lights at the start, then ceilings and final fittings at the end. We set exposure so the space does not jump from dark to bright, and we film the final reveal with the lights the way the client will use them.

Services above the ceiling and behind walls disappear quickly. If you want the MEP stage on record, tell us before the ceiling grid goes up. See fit-out video production for filmed walkthroughs and interviews.

  • i.Changing light levels
  • ii.Scaffold and partitions
  • iii.Dust from sanding and cutting
  • iv.MEP work hidden by ceilings

FAQs

Fit-out time-lapse FAQs.

i.How long does a fit-out time-lapse run?

As long as the fit-out, usually four to sixteen weeks. Larger offices and hotel fit-outs can run longer.

ii.Will the camera get in the way of the work?

The site manager approves the spot, normally a high corner away from doors and material routes, so trades work around it without noticing.

iii.Can you use two cameras?

Yes. Two angles help in long or L-shaped spaces and give the editor more to work with.

iv.Can we have before-and-after photos as well?

Yes. We pull matching stills from the first and last days, which work well for proposals and social posts.

v.Do you film the finished space too?

Yes. We can add a filmed walkthrough or an interview with the designer or client to make a full project film.

vi.How much does a fit-out time-lapse cost?

Two things drive it: how many weeks the fit-out runs and whether you want one camera or two. Share the floor plan and programme and you get a fixed quote.

Get in touch

Planning a fit-out time-lapse?

Send the type of space, location and fit-out dates. We reply within one working day.

OfficeDubai, UAE
Chat on WhatsApp